Skip to content
FastTool

Why a cron job with both day-of-month and day-of-week runs on unexpected days

Setting both day-of-month and day-of-week in a 5-field crontab matches either day rule rather than requiring both on the same date.

Updated · Uses the free Cron Expression Explainer, which runs in your browser

Short answer

Under IEEE Std 1003.1 POSIX rules, setting both field 3 (day-of-month) and field 5 (day-of-week) matches their union (OR), not their intersection (AND). A schedule like 0 9 13 * 5 runs on the 13th of every month plus every Friday — 64 times in 2027. Leave field 5 as * and add a date +\%u test to your command, then check next runs in the Cron Expression Explainer.

Open the Cron Expression Explainer

What IEEE Std 1003.1-2024 specifies

Four cron fields combine with AND: minute, hour and month must all match. The POSIX crontab standard (IEEE Std 1003.1-2024, checked 28 November 2026) treats the two day fields differently.

  • Only day-of-month set (0 9 13 * *): field 5 is an asterisk, so it runs only on the 13th (12 runs yearly).
  • Only day-of-week set (0 9 * * 5): field 3 is an asterisk, so it runs only on Fridays (52 or 53 runs yearly).
  • Both day fields restricted (0 9 13 * 5): neither field is *, so cron matches any day satisfying day-of-month OR day-of-week.

Many cron helpers describe 0 9 13 * 5 in English as “on day 13 and on Friday”. In everyday English, “and” sounds like both conditions at once, yet cron reads it as two separate lists of dates.

Worked example: 0 9 13 * 5 across the 2026 and 2027 calendars

Open 0 9 13 * 5 from 1 January 2027 in the Cron Expression Explainer to inspect each run and matching rule.

In January 2027, the 13th falls on a Wednesday, so January has zero Friday-the-13ths. Under POSIX OR, 0 9 13 * 5 still fires six times in January 2027. Those dates are Fri 1 Jan, Fri 8 Jan, Wed 13 Jan, Fri 15 Jan, Fri 22 Jan and Fri 29 Jan.

Annual run counts for 0 9 13 * 5 under POSIX OR versus a true Friday-the-13th AND check
Calendar year Days numbered 13 Fridays Friday-the-13th dates (AND) Actual 0 9 13 * 5 runs (OR)
2026 12 52 3 (13 Feb, 13 Mar, 13 Nov) 61 (12 + 52 − 3)
2027 12 53 1 (13 Aug) 64 (12 + 53 − 1)
2028 (leap year) 12 52 1 (13 Oct) 63 (12 + 52 − 1)

The same trap hits “first Monday of the month” schedules. Expression 0 9 1-7 * 1 runs on days 1–7 PLUS every Monday all month (10 or 11 runs monthly).

The Vixie cron */N leading-asterisk quirk

Older Debian and Ubuntu Vixie cron builds add another twist on leading-asterisk steps like 0 9 */2 * 1. Open 0 9 */2 * 1 from 1 January 2027 in the Cron Expression Explainer to inspect both interpretations.

  • POSIX, Red Hat/Fedora cronie and GitHub Actions (OR): neither */2 nor 1 is a bare asterisk. Field 3 steps odd days (1, 3, …, 31), plus every Monday matches too — including even Monday 4 January 2027.
  • Debian/Ubuntu Vixie cron 3.0pl1 (AND): Vixie’s parser checks only whether the first character of the field is an asterisk. Leading */2 triggers AND mode, skipping 1, 3 and 4 January and running first on odd Monday 11 January 2027.
  • Rewriting as 0 9 1-31/2 * 1: both step expressions select the identical odd dates 1 through 31. Starting with 1 instead of an asterisk clears Vixie’s star flag and flips Debian cron back to OR.

Never rely on the leading-asterisk bug for intersection logic. Moving the same crontab from Ubuntu to AlmaLinux, Fedora or GitHub Actions silently multiplies its run count.

Portable fix: keep * in one day field and guard with date

To require BOTH a date and a weekday everywhere, leave one day field as * and check the other in shell.

0 9 13 * * [ "$(date +\%u)" -eq 5 ] && /path/to/job
0 9 * * 1 [ "$(date +\%d)" -le 07 ] && /path/to/job
  1. Leave one day field as *. Putting * in field 3 (0 9 * * 1) wakes cron only four or five Mondays a month instead of seven mornings.
  2. Use ISO weekday %u (1 = Monday, 5 = Friday, 7 = Sunday). POSIX date +%u avoids locale names and 0-versus-7 Sunday differences.
  3. Always escape percent signs as \% inside crontab. POSIX and Linux crontab(5) turn unescaped percent signs into newlines and send trailing text to standard input. Writing date +%u without the backslash cuts the command in half before the closing quote.
  4. Put the date check inside a script if you prefer clean crontabs. Inside a normal shell script file (outside the crontab file itself), write plain date +%u without the backslash.

Coordinating scheduled jobs with teammates across regions? Check local working hours side by side in the Time Zone Meeting Planner before locking in a UTC run window.

When a 5-field crontab is the wrong tool

Standard 5-field cron has no built-in modifier for “last Friday of the month” or “nearest business day to the 15th”. AWS EventBridge uses 6 fields and requires ? on one day field, preventing combined day rules. Systemd timers (OnCalendar=Fri *-*-13 09:00:00) intersect weekday and date with AND natively.

Sources

Spotted a mistake in this guide? Email contact@fasttool.app. We reply within 7 business days.

Open the Cron Expression Explainer